Conejo Open Space Trailwork Day, October 16, 2010
Building a connector between the upper and Lower Santa Rosa Trails

Photos of VenturaCountyTrails.Org. Click on an image to see it full size.

Photos Home    

20101016022CORBAFatTireFestNightRide.jpg
Unloading tools that will be used to make the new trail
1062298682_20101016002cosca_trailwork_day.jpg
Volunteers head down to get started
JuliePenryTO.jpg

AlikandDanielaShulmanTO.jpg

KristinFoordTOalsoPeteCapozzoliTO.jpg

1062320130_20101016005cosca_trailwork_day.jpg

GordonBowersNewburyPark.jpg

1062315359_20101016004cosca_trailwork_day.jpg

DamonMontanezSimiValleyCarlynTaggartVanNuysLanceBiscoeTO.jpg

1062325315_20101016009cosca_trailwork_day.jpg
After the trailwork, a thank-you lunch for the volunteers and a drawing for prizes, including this mountain bike as the grand prize
IMG_1720.jpg
A week later, taking a hike on the new trail, it forks off to the left from the Santa Rosa Trail
IMG_1721.jpg
About to turn off the Santa Rosa Trail onto the new connector trail.
IMG_1724.jpg

IMG_1725.jpg
There are some rocky spots
P1050498.jpg

P1050499.jpg
The fields in Santa Rosa Valley at the bottom are deep green
IMG_1728.jpg
Horses have been up the trail when it was still soft from the recent rain
P1050500.jpg

IMG_1731.jpg
There are several switchbacks
IMG_1732.jpg
This switchback is almost at the bottom
P1050501.jpg
We find some members of the COSCA Trail Patrol at the bottom on the Lower Santa Rosa Trail (AKA the Baseline Trail).
IMG_1737.jpg
On the way back up, we spot some puffballs growing in the middle of the trail
IMG_1738.jpg
They look like boulders from this angle!
IMG_1744.jpg

IMG_1748.jpg

IMGP0017.jpg
Just about back up to the top