|
|
This new drain is almost finished. The final step(s) is to pack it down by stamping it with your feet.
|
|
|
|
This trail 'cut' (shortcut) is being covered with rocks to disuade people from using it.
|
|
|
Filling in the rut with gravel taken from the steambed.
|
|
|
|
Rocks in the drain slow down water running off the trail so it doesn't errode a rut down the hillside.
|
|
|
A highschool bike team comes by as we're working. They help during the Annual Trailwork Day in October, but in the spring they're in training.
|
|
|
|
It's a pretty big team!
|
|
|
|
Lunch at the registration area at noon, after the trailwork is finished.
|
|
|
|
|
|
|
|